Ørsted / Kontrapunkt
As DONG ENERGY in 2017 took a new strategic direction with the aim to be producing and distributing 100 % renewable energy in contrary to past, a new designdirection was needed. Apart from a new strategy and a new name the proces also included signage for all administration and production facilities in DK and International.
We have assisted Kontrapunkt in developing the Signage Programme for Ørsted – former DONG ENERGY. The contribution in this case was to be part of the Spatial design team that developed the Signs and the Signage System for Ørsted.
The sign shown in the pictures below, is the largest in the signage programme. It is situated in front of the Ørsted headquarters in Gentofte DK.